Commit Graph
2 Commits
Author SHA1 Message Date
openclaw 745395e93b docs: update V1R4C6 gate status, acceptance checklist, and acceptance evidence to NOT RUN
All engineering gates remain pending. This updates the release documents
to reflect the current integration-pending status after PR #6 merged.
2026-07-11 17:06:31 +08:00
openclaw 8410cd895e reconcile: merge V1R4C6 release candidate into main
V1R4C6 merge candidate (squashed).
Contains 10 files, ~1440 lines added across:
- docs/releases/ (6 files: checklist, evidence, blocker, resume, merge-matrix, gate-status)
- ops/openclaw/ (2 files: integrate-deploy-verify, run-to-owner-gate-wechat)
- patches/ (1 file: branch patch)
- versions/ (1 file: V1R4C6.json)

Task: admin workbench, SR-03 Search Gateway, Agent Platform Integration
Baseline: V1R4C5
V1R4C5 tag semantics:
- tag refs/tags/V1R4C5 target d457ac3: immutable release snapshot
- baseline git a32c76a: runtime baseline promotion commit
No tag creation, baseline promotion, or memory search activation in this merge.
2026-07-11 16:34:03 +08:00